If the diameter of the base of a cylindrical pillar is 7 m and its height is 35 m, then the cost of construction of the pillar at Rs.10 per cubic meter is:
1
Rs. 14475
2
Rs. 13475
3
Rs. 12400
4
Rs. 13400