engineering recuitment PSTCL ALM (Assistant Lineman) 2021 Mock Test Power Systems Transmission and Distribution
In comparison to overhead transmission, in underground systems:
1
Voltage loss is less
2
Fault correction is easier
3
Value of charged current is less
4
Initial cost of the system is low