engineering recuitment JKSSB Draftsman (Civil) Mock Test 2023 Irrigation Engineering Diversion Headworks
Which construction is at the head of the canal to divert the river water towards the canal?
1
Storage head work
2
Diversion head work
3
Barrage
4
Weir