engineering recuitment Punjab SSSB Jr Draftsman Civil Mock Test 2021 Environmental Engineering Quality of Water
For which of the following, distribution mains is designed?
1
Average daily demand
2
Annual peak demand
3
Monthly peak demand
4
Maximum hourly demand on maximum day