engineering recuitment Maharashtra WCD Water Conservation Officer Mock Test 2024 Irrigation Engineering Dams and Spillways
Provision of a filter and rock toe in an earthen dam is done to
1
Prevent the piping action in the dam section
2
Collect and drainout the seepage water out of dam
3
Reduce the quantity of seepage.
4
Both (1) and (2)