The following data were obtained from testing a 48 kVA, 4800/240 V, 50 Hz transformer.
|
OC test from LV side |
240 V |
2 A |
120 W |
|
SC test from HV side |
150 V |
5 A |
60 W |
The maximum efficiency (in %) of the transformer 0.707 lagging power factor load is ________ (up to two decimal places)
Enter numerical value using the virtual keypad. Round off where necessary.