Match the following:

A)

Cost plus percentage rate contract

i)

Unit Price contract

B)

Labour contract

ii)

Above or below percent

C)

Percentage Rate contract

iii)

Actual cost plus added percentage

D)

Item Rate contract

iv)

Labour cost excluding materials

1
A – (iii) B – (i)    C – (iv)  D – (iii)
2
A – (iii) B – (ii)   C – (i)    D – (iv)
3
A – (iii)  B – (iv)  C – (ii)   D – (i)
4
A – (iv)  B – (iii)  C – (ii)   D – (i)