In absence of a detailed drawing for the reinforcement of a beam, the percentage of steel may approximately be taken as
1
0.5 to 0.8% of volume of concrete
2
1.0 to 2.0% of volume of concrete
3
3.0 to 5.0% of volume of concrete
4
6.0 to 8.0% of volume of concrete