engineering recuitment RPSC Programmer Mock Test 2024 Computer Networks TCP/UDP and Sockets, Congestion Control Congestion Control
Consider the effect of using slow start on a line with 10 msec RTT and no congestion. The receiver window is 24 KB and the maximum segment size is 2 KB. How long does it take till the first full window can be sent?
1
30 msec
2
40 msec
3
50 msec
4
20 msec
5
Question Not Attempted