engineering recuitment WBMSC Sub Assistant Engineer Civil Mock Test 2023 Estimating, Cost and Valuation
A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called:
1
Tender
2
Scheduled of rates
3
Analysis of rate
4
Abstract estimate.