For a reinforced concrete beam with M 20 concrete with Fe 415 steel, the working moment corresponding to ‘balanced failure’ by the Limit Sate Method of Design is A times of the relatable magnitude of the working moment computed by the Working Stress Method. This value of A is nearly 

1
1.0
2
1.5
3
2.0
4
2.5 