engineering recuitment UKPSC Polytechnic Lecturer Mock Test 2024 Hydrology Flood Routing and Flood Control
A detention basin for flood control is the one which is provided with
1
controlled outlets but uncontrolled spillway
2
controlled outlets and spillway.
3
uncontrolled outlets and spillway
4
uncontrolled outlets but controlled spillway