engineering recuitment UKPSC Polytechnic Lecturer Mock Test 2024 Estimating, Cost and Valuation Valuation
A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called _________
1
Tender
2
Schedule of rates
3
Analysis of rate
4
Abstract estimate