At a project site, the head available is 10 m of water at flow rate of 0.2 m3/s. If the loss in the pipeline is 10 % and overall efficiency is 90 %. Then
1
The turbine designed should be pelton turbine
2
The turbine designed should be Kaplan turbine
3
The head available at the nozzle is 9 m
4
The power developed by the turbine will be 15.89 kW