engineering recuitment MP Vyapam Sub Engineer Mock Test 2024 Hydrology Flood Routing and Flood Control
For an annual flood series arranged in decreasing order of magnitude, the return period for a magnitude listed at position min a total of N entries is
1
m/N
2
m/(N + 1)
3
(N + 1)/m
4
N/(m + 1)