engineering recuitment MP Vyapam Sub Engineer Mock Test 2024 Irrigation Engineering Design of Canals
Cross regulator is provided on the main canal at the downstream of the off-take canal:
1
to regulate water supply in the off-take canal
2
to increase water head in upstream when the main is running with low supplies
3
to overflow excessive flow of water
4
None of the above