A triangular direct run off hydrograph due to a storm has a time base of 90 hour. The peak flow of 60 m3/s occurs at 20 hours from the start of the storm. The area of catchment is 300 km2. The rainfall excess of the storm (cm) is
1
5.40
2
6.48
3
2.00
4
3.24