engineering recuitment UPSSSC JE Civil 2024 Mock Test Construction Materials and Management Concrete
Which one of the following is NOT required for concrete mix design ?
1
Maximum free water-cement ratio by weight
2
degree of workability of concrete
3
Initial setting time of cement
4
Maximum/minimum cement content