railway DFCCIL Junior Executive 2023 (CBT 1 & CBT 2) Mock Test Power Systems Economies of Power Generation
Which of the following options is TRUE about two-part tariff and the maximum demand tariff?
1
No meter is required for the maximum demand tarrif
2
Maximum demand tarrif is charged as a % of the two-part tariff
3
A single meter is used for both the tariffs
4
Separate meters are used for both of them