railway RRB JE (CBT I + CBT II) Mock Test 2024 Industrial Engineering Operations Research PERT and CPM
A job design to be time-studied has fatigue and delay allowance of 10 minutes & 25 minutes 8-hour shift. In addition, 25 minutes of personal time is permitted in a shift. Then, the total allowance factor to calculate Standard Time for this activity Will
1
1.143
2
12.0
3
0.8
4
None of these