railway RRB JE (CBT I + CBT II) Mock Test 2024 Industrial Engineering Production Planning and Inventory Control
_______ is the main drawback of product layout.
1
Production time is longer, requiring more goods in inventory
2
High initial investment for the specialized facilities
3
Skilled labour to operate machines
4
High cost of inspection