railway RRB JE (CBT I + CBT II) Mock Test 2024 Industrial Engineering Operations Research PERT and CPM
_______ is used to indicate an event on the network.
1
A dotted line
2
A straight line with circles at the ends
3
A straight line
4
A number enclosed in a circle or a square