railway RRB JE (CBT I + CBT II) Mock Test 2024 Estimation and Costing Estimation Power System Equipment
What does S in ‘IP 11S’ represent?
1
The machine was tested when not running condition
2
Machine was tested when it was in running
3
Machine was tested at light load
4
None of these