railway RRB JE (CBT I + CBT II) Mock Test 2024 Soil Mechanics and Foundation Engineering Bearing Capacity
While designing the pile as a column, the end conditions adopted is -
1
One end fixed and other end hinged
2
Both ends fixed
3
One end fixed and other end free
4
Both ends hinged