railway RRB JE (CBT I + CBT II) Mock Test 2024 Industrial Engineering Production Planning and Inventory Control Inventory Control
Mean rate of consumption during the lead time (R) multiplied by mean lead time (L) is equal to
1
Reserve stock
2
Buffer stock
3
Safety stock
4
None of these