railway RRB JE (CBT I + CBT II) Mock Test 2024 Industrial Engineering Production Planning and Inventory Control Inventory Control
In the EOQ model, if the unit ordering cost is doubled, the EOQ
1
Is halved
2
Is doubled
3
Increases 1.414 times
4
Decreases 1.414 times