railway RRB JE (CBT I + CBT II) Mock Test 2024 Construction Materials and Management Building Component
In a cutting and filling operation on a sloping site, the balance of earthwork is achieved by:
1
Increasing compaction in cut areas
2
Designing bench levels with cross-sectional averaging
3
Providing retaining walls only
4
Applying soil nailing