The estimated water content to produce a concrete sample with workability 50 mm is 186 litres. Calculate the extra volume of water to be added to increase the workability from 50 mm to 125 mm.
1
9.00 litres
2
18.97 litres
3
12.56 litres
4
16.74 litres