Match List-I with List-II
|
List I |
List II |
||
|
a. |
Optimum utilization of men, money, materials and machines. |
i. |
Job evaluation |
|
b. |
Process flow chart |
ii. |
Planning Horizon |
|
c. |
Master Production Schedule |
iii. |
Work study |
|
d. |
Ranking method |
iv. |
Plant layout |
Choose the correct code:
1
a - iii, b - iv, c - ii, d - i
2
a - i, b - ii, c - iii, d - iv
3
a - ii, b - i, c - iii, d - iv
4
a - iii, b - iv, c - i, d - ii