Teaching UGC NET Mock Test Series 2025 (Paper 1 & 2) Quantitative Aptitude Speed Time and Distance Problem on Trains
A 270-m-long train takes 24 seconds to cross a pole. If it takes 1 minute to cross a tunnel, then the length (in m) of the tunnel is:
1
507
2
405
3
510
4
408