Which of the following is unfavourable for economic bridge construction?
1
The existing road passes very near to the proposed bridge site.
2
The rock foundation is available at 40 m depth from the ground surface.
3
The river width is narrow. The current velocity is small. The river has mild gradient.
4
Inexpensive labour and ample construction material is available near the proposed bridge site.