The above figure represents plan and section of an excavation layout. The volume of earthwork in excavation of foundation trench is
1
6.528 cu.m.
2
8.064 cu.m.
3
8.832 cu.m.
4
9.600 cu.m.
The above figure represents plan and section of an excavation layout. The volume of earthwork in excavation of foundation trench is