Match the workability tests with their measurements for fresh concrete.

Workability test

Measurement

(A)

Slump test

(1)

300 mm to 500 mm 

(B)

Compacting factor

(2)

75 mm to 125 mm

(C)

Vee Bee test

(3)

0 .80 to 0.98

(D)

Flow test

(4)

Zero to 10 s

1
A - 4, B - 3, C - 2, D - 1
2
A - 2, B - 4, C - 3, D - 1
3
A - 2, B - 1, C - 4, D - 3 
4
A - 2, B - 3, C - 4, D - 1