engineering recuitment Vizag Steel MT Mechanical 2020 Test Series Industrial Engineering Production Planning and Inventory Control Line Balancing and Work Study
During the time study on a job, the representative time, the rating and allowances are observed to be 0.4 minutes, 120% and 10% of standard time respectively. The normal time and standard time, in minutes are respectively.
1
0.48 and 0.533
2
0.7 and 0.8
3
0.533 and 0.48
4
0.6 and 0.066