engineering recuitment Vizag Steel MT Mechanical 2020 Test Series Production Engineering (Manufacturing) Machining Processes and Machine Tools Taylor's Tool Life Equation
If Taylor’s tool life exponent n is 0.25 and the tool changing time is 2 mins, the tool life (in seconds) for maximum production rate is
1
200
2
360
3
120
4
180