Industrial Engineering Production Planning and Inventory Control Aggregate Production Planning and Scheduling
In a time study, observed time is 0.75 min, rating factor = 110% and allocations are 20% of normal time, then standard time are
1
0.82 Min
2
0.975 Min
3
0.99 Min
4
1.03 Min