engineering recuitment TANGEDCO Field Assistant (Trainee) Mock Test Electrician and Wireman Power Systems Generation of Electrical Energy
A plant is running on 400 V, 50 Hz LT supply for 10 hours. The load comprises lighting load of 2.5kW @ 0.9 pf lagging on R-phase, heater load 5 kW @ UPF on Y-Phase and a 3-Phase SCIM drawing 5 kW @ 0.8 pf lagging. What is the total energy consumption by the loads?
1
120 units
2
100 units
3
125 units
4
12 units