engineering recuitment TANGEDCO Field Assistant (Trainee) Mock Test Electrician and Wireman Electrical Wiring House Service Connections and Wiring Layout
The control panel should be installed from the ground at a height of ________
1
3.00 metre
2
2.50 metre
3
1.50 metre
4
1.00 metre