engineering recuitment UPCL AE (E&M) 2021 Mock Test Power Systems Economies of Power Generation Load Factor
Energy produced in a power station is 1440 MWh per day. What is the maximum demand of the station if its load factor is 0.5?
1
120 MW
2
280 MW
3
60 MW
4
140 MW