As per Manual on Sewerage and Sewage Treatment, Central Public Health and Environmental Engineering Organization, Ministry of Urban Development, Government of India, when a sewer connects with another sewer having a difference of 600 mm in level between the water lines (peak flow levels) of main line and the invert of branch line, the connection may be provided using a

1
Side entrance manhole
2
Junction manhole
3
Flushing manhole
4
Drop manhole