In the laying of RCC hume pipe for pipe culvert of 30 m length, Determine the cost per running meter with the help of following data.

Length & Diameter of each hume pipe = 3 m & 1000 mm

Mortar required each joint = 0.5 m3 

Cost of cement bag  = Rs. 220 per bag

Cost of cement sand = Rs. 450 per m3 

Cost of RCC hume pipe = Rs. 2000 per m

Overall labour cost = Rs. 7199

(Use 1:3 mortar and consider 10% contractor's profit)  

1
Rs. 6700
2
Rs. 9865
3
Rs. 3856
4

Rs. 2934