engineering recuitment FCI JE 2022 Mock Test for CE/ME/EE (Phase I & II) Reinforced Concrete Structures Footings
In R.C.C. cantilever retaining wall, if the check for overturning is not satisfied, which of the following would serve the better in meeting the check?
1
increasing the heel slab span
2
decreasing the toe slab span
3
providing a sloping backfill
4
providing a shear key
5
All of these