engineering recuitment NCL Assistant Foreman (Trainee) Mock Test 2024 Estimation and Costing Installation of Machines
The board on which the energy meter, cut-out, neutral link are installed is called _________.
1
service board
2
switch board
3
main switch board
4
distribution board