A synchronous generator is connected to infinite bus through a loss – less line. It is delivering initially 0.5 pu power to infinite bus. The infinite bus voltage is 1.0. the maximum power transfer before fault is 1.0 pu. The inertia constant is 6 MJ/MVA. the critical clearing angle is 75°, then the critical clear time is _______(in sec)