A four-phase signal critical lane traffic flow is given in table below:

Direction

Design hour

Flow (PCU/hr)

Saturation

Flow (PCU/hr)

East - West

500

3000

West - East

450

1800

North - South

250

2200

South - North

-

2500

The lost time is given as 3 secs for each phase. If the cycle length is 70 seconds, then the effective green time (in seconds) of the fourth phase is ______.