engineering recuitment BHEL Engineer Trainee Mock Test 2025 Production Engineering (Manufacturing) Metal Casting Solidification Time
With a solidification factor of 0.97 × 106 s/m2, the solidification time in seconds for a spherical casting of 200 mm diameter is :
1
539
2
1078
3
4311
4
3233.