In two methods A and B of a network analysis, the following methods are true about them.

Method A - Project cost increases if time duration is either increased or decreased.

Method B - Project cost varies directly with time.

Method A and Method B are called respectively

1
Both are PERT
2
PERT, CPM
3
Both are CPM
4
CPM, PERT