engineering recuitment BHEL Engineer Trainee Mock Test 2025 Power Engineering Gas and Vapor Power Cycles Rankine Cycle
In a Ranking cycle, the work done by turbine during expansion of steam is 8 kJ while the work required for pump to feedback the water into the boiler is 6 kJ. Determine the work ratio.
1
0.9
2
0.25
3
0.34
4
0.75