engineering recuitment UKPSC Polytechnic Lecturer Mock Test 2024 Construction Materials and Management Concrete
The aggregates required for one kilometer length of water bound macadam road per metre width and for one centimeter thickness is :
1
8 cubic metre
2
10 cubic metre
3
12 cubic metre
4
15 cubic metre