The load factor and plant capacity factor of a generating station is 50% and 40% respectively. If the maximum demand of the station is 15 MW, then the reserve capacity of the station is:

1
15 MW
2
3.75 MW
3
18.75 MW
4
7.5 MW
5
1 MW